代写 Building Measurement

  • 100%原创包过,高质代写&免费提供Turnitin报告--24小时客服QQ&微信:120591129
  • Building Measurement 1
    Assessment Brief 2016
    You have been supplied the designs of two different institutional building projects. You are
    required to:
    • choose any of these,
    • use any software application,
    • measure (i.e. show all your calculations in a take-off format) and prepare bill of
    quantities for any three of the following:
    o masonry
    o doors and windows
    o roof frame
    o roof covering
    o floor finishes
    o timberwork
    o external paving
    • make reasonable assumptions where necessary – and document all your assumptions in
    your query sheet,
    • document your answers (i.e. take-off and BoQ) only as soft copies, ensure you convert
    all your documents into a single portable document format file,
    • submit only through turnitin, before 11:59pm of May 06, 2016,
    • keep a receipt of your submission intact.
    Building Measurement 241: Marking Rubric
    Student Name Student ID
    Attribute  Fail
    (0-49%)
    Pass
    (50-64%)
    Credit
    (65-74%)
    Distinction
    (75-84%)
    High Distinction
    (85-100%)
    Formatting (10%):
     Cover (Assignment title, student IDs
    etc)
     Adherence to conventions (preamble,
    take-off list, page referencing, drawing
    numbers, job reference etc)
     Packaging (neatness, evidence of
    professionalism in student’s work,
    overall quality of submission)
     Collection and summary formatting
    No/incomplete cover sheet
    Poor understanding of take-off
    conventions
      No take-off list
      Poor page referencing
      No preamble
      Job reference/Drawing
    numbers not stated
    Submission is rough and untidy
    Poor quality of work
    No collection and Summary cells
    Complete but messy cover sheet
    Superficial understanding of take-off
    conventions
      Incomplete take-off list
      Confusions page referencing
      Ambiguous preamble
      Clear job reference/ Drawing numbers
    not stated
    Submission is somewhat untidy
    Acceptable quality of work
    Collection and summary cells poorly used
    Exceptional quality of presentation;
    strong evidence of understanding
    and fulfilment of task requirements;
    take-off is perfect; use of
    convention is faultless; pages
    properly referenced; clear preamble
    to measured work; clear referencing
    of job, drawing numbers and
    measurement work-sheet pages;
    tidy submission, and; Collection
    and Summary cells perfectly used
    and shown.
    Take-off (40%
     Accuracy of data entry
     Use of take-off conventions
     Precision of description
     Quality of outcome/reportage of data
    processing
     Integrity of submission
    Poor style of data entry
    Proper understanding of Take-off
    conventions not demonstrated
    Lack of precision in descriptions
    Many unsubstantiated calcs
    Error in quantity measurement
    processes (extension, timesing
    etc)
    Integrity concern on submission
    Faulty style of data entry
    Some typo/grammatical blunders/long
    rambling descriptions
    Few unsubstantiated calcs
    Project not measured in appropriate context
    Unconvincing, untidy
    Few clarity and precision issues
    No integrity concern on submission
    Strong content
    Exceptional professional judgment
    No grammatical error
    High quality of reflection on project
    context
    Exceptional writing style
    Most calcs are substantiated with
    sketches and worked up dimensions
    Work is clear and precise
    No integrity concerns
    Bill of Quantities (50%)
     Accuracy of measured quantities
     Precision of description
     Accurate itemization of measured work
     Robustness/completeness of
    measurements
     Adherence to A/SMM rules
    >50% of measured work lacks
    accuracy
    >50% of work description is not
    implementable
    Lack of technical depth
    >50 of appropriate items omitted
    in the Bill
    A/SMM rules not adhered to in
    more than 50% of measured items
    <50% of measured work lacks accuracy
    <50% of work description is not
    implementable
    Lack of technical depth
    <50 of appropriate items omitted in the Bill
    A/SMM rules not adhered to in less than
    50% of measured items
    All items are measured accurately
    All work description are perfect and
    implementable
    Exceptional technical depth
    No appropriate item is omitted in
    the Bill
    All A/SMM rules are adhered to in
    all the measured items
    Total Marks  Comments
    BUILDING MEASUREMENT - QUERY SHEET
    Blank Query Sheet.xls BM Page 1 of 1 28/03/2014 9:42 AM
    Student's Name:
    Student's Number:
    Project:
    No. Date Query Answer By Date
    1
    2
    3
    4
    5
    6
    7
    8
    9
    10
    11
    12
    13
    14
    15
    Project Option 1 – Mussalla Building
    MUSALLA - BUILDING 510 - LEVEL 01 2012
    PROJECT NUMBER UPJ0246 VOL. 1 OF 1
    COVER PAGE
    DOCUMENTATION BY:
    ARMSTRONG PARKIN ARCHITECTS
    41 HIGH STREET FREMANTLE W.A. 6160
    BENTLEY CAMPUS
    University Properties
    University of Technology
     
    G G
    H
    D D  E  M  O  L  I  T  I  O N N P  L  A N N
    1:200
    WESTERN  AUSTRALIA  6160
    ABN  52  009  237  601
    T:  9433 8 1388 F:  9433  1991
    This  drawing  is  copyright  and  shall  always  remain  the  property f of
    ARMSTRONG  PARKIN  PTY  LTD  and  must  not  be  used  in  any  manner t without
    the  prior  written  approval  of  that  company.  Verify  all  dimensions  on  site d and
    report  all  discrepancies  to  the  Architect.  Await  Architect's  instructions r prior
    to  the  commencement  of  construction  or  fabrication.
    mail@armstrongparkin.com.au
    NORTH
    0 0
    PROJ
    APP
    REVISION REV DATE N DRN  CHK
    SP AS  CONSTRUCTED 17.06.13 CC SP
    EXISTING  BUILDING  212
    TEXTILES  +  PRINTMAKING
    EXISTING
    BUILDING  221
    GPO  BOX  U1987  PERTH  WA  6845
    TEL  9266 6 9266 FAX  9266  2660
    University  Properties
    University of Technology
    DRN  BY
    CLIENT  APP
    DESIGNED
    DATE
    CHECKED
    PROJ  APP
    This This drawing drawing is is the the property property of of Curtin Curtin University University and and furnished furnished for for the the
    sole sole use use of of the the recipient. recipient. Acceptance Acceptance of of the the same same constitutes constitutes an an
    agreement agreement that that it it will will not not be be published, published, reproduced, reproduced, transmitted transmitted or or
    given given to to any any other other party party without without our our permission. permission. Infringement Infringement of of the the
    above above may may attract attract claims claims for for compensation. compensation.
    CHECK  SITE  DIMENSIONS
    AND  VERIFY  DRAWINGS
    PRIOR  TO  CONSTRUCTION
    BENTLEY  CAMPUS
    UPJ0246
    01B510-A-DP0102
    02 25 0 0
    1:200
    AS  CONSTRUCTED
    A1
    AW
    31-05-2012
    SP
    SP
    SP
    CURTIN
    ISSUE
    CURTIN
    PROJ  No
    SCALE
    DWG  No
    G DWG
    STATUS
    SHEET OF
    SHEET
    SIZE
    MUSALLA
    DEMOLITION  PLAN
    BLDG  510  LEVEL  01
    R7
    R1
    R1
    R1
     
    G G
    H
    S S  I  T E E P  L  A N N
    1:200
    E MALE
    ENTRY
    E FEMALE
    ENTRY
    RETAIN  AND T PROTECT
    G EXISTING VEGETATION
    RETAIN  AND T PROTECT
    G EXISTING VEGETATION
    RETAIN  AND T PROTECT
    G EXISTING VEGETATION
    EXISTING  BUILDING  212
    TEXTILES  +  PRINTMAKING
    RETAIN  AND  PROTECT G EXISTING
    PATHWAY
    REALIGNED  SEGMENTAL D PAVED
    PATHWAY  REFER  TO E LANDSCAPE
    DOCUMENTATION
    SEGMENTAL  PAVED . PATHWAY.
    REFER  TO E LANDSCAPE
    DOCUMENTATION
    SEGMENTAL  PAVED . PATHWAY.
    REFER  TO E LANDSCAPE
    DOCUMENTATION
    RETAIN  AND T PROTECT
    G EXISTING PATHWAY
    CONTRACTORS D COMPOUND
    WITHIN  CARPARK  9B
    WESTERN  AUSTRALIA  6160
    ABN  52  009  237  601
    T:  9433 8 1388 F:  9433  1991
    This  drawing  is  copyright  and  shall  always  remain  the  property f of
    ARMSTRONG  PARKIN  PTY  LTD  and  must  not  be  used  in  any  manner t without
    the  prior  written  approval  of  that  company.  Verify  all  dimensions  on  site d and
    report  all  discrepancies  to  the  Architect.  Await  Architect's  instructions r prior
    to  the  commencement  of  construction  or  fabrication.
    mail@armstrongparkin.com.au
    NORTH
    0 0
    PROJ
    APP
    REVISION REV DATE N DRN  CHK
    SP AS  CONSTRUCTED 17.06.13 CC SP
    E FEMALE
    COURTYARD
    E MALE
    COURTYARD
    BUILDING  501
    MUSALLA
    FFL 5 9.475
    RETAIN  AND  PROTECT G EXISTING
    GRASSED  AREA
    LINE  OF  COURTYARD  FENCE  TO  MALE  + E FEMALE
    COURTYARDS.  REFER  TO  DRAWING  CP0104
    GARDEN  BED R REFER
    TO E LANDSCAPE
    DOCUMENTATION
    GARDEN  BED.  REFER O TO
    LANDSCAPE  DOCUMENTATION.
    SEGMENTAL  PAVED  PATHWAY.  REFER O TO
    E LANDSCAPE DOCUMENTATION. .
    STONE H MULCH
    GROUND . TREATMENT.
    REFER  TO E LANDSCAPE
    DOCUMENTATION
    RETAIN  AND T PROTECT
    G EXISTING GRASSED  AREA
    VERANDA
    WW102
    FFL  9.475
    VERANDA
    WW101
    FFL  9.475
    MUSALLA
    SITE  PLAN
    BLDG  510  LEVEL  01
    EXISTING  TREE
    LEGEND
    EXISTING  TITLE/LOT  BOUNDARY
    EXISTING  FENCE
    EXISTING  BUILDING
    E E  X  I  S  T  I  N  G
    EXISTING  CONTOUR  LEVEL
    29
    30.35
    EXISTING  SPOT  LEVEL
    N N  E W W W  O  R  K  S
    EXTENT  OF  NEW  BUILDING  WORKS
    RL  30.38
    NEW  LEVEL
    CONCRETE
    EXTENT  OF  CONTRACTORS  FENCE  LINE
    NEW  TREE
    NOTE: :
    . 1. UNLESS  OTHERWISE  NOTED  ALL  WORK  SHOWN  ON S THIS
    DRAWING  IS  NEW  WORK
    . 2. CONNECTION  BETWEEN  ADJACENT  SURFACES: H MATCH
    DIMENSIONS  +  LEVELS  OF  NEW  SURFACE  WITH  EXISTING. E ENSURE
    FLUSH  +  EVEN  TRANSITION  BETWEEN  SURFACES.  MAXIMUM L VERTICAL
    DISTANCE  5MM  UNLESS D NOTED OTHERWISE
    . 3. ENSURE  TO  CO-ORDINATE  INFORMATION  IN  THIS G DRAWING
    WITH  OTHER  ARCHITECTURAL  DOCUMENTATION  AND  ALL D ASSOCIATED
    CIVIL,  STRUCTURAL,  HYDRAULIC, , ELECTRICAL  + E LANDSCAPE
    DOCUMENTATION
    GAS/WATER R METER
    BOX . ENCLOSURE.
    REFER  TO  DETAIL 3 123
    ON  DRAWING  FD0122
    A CAMERA
    POLE.
    REFER O TO
    , ELECTRICAL,
    STRUCTURAL + +
    Y SECURITY
    DOCUMENTATION
    L L  O  C  A  T  I  O N N P  L  A N N
    1:5000
    NORTH
    BUILDING  501
    MUSALLA  LOCATION
    PAVING  DRAINS
    REFER O TO
    C HYDRAULIC
    S ENGINEERS
    DOCUMENTATION
    SETOUT  POINT
    NEW  CONTOUR  LEVEL
    29
    212
    MANNING  ROAD
    BRAND  DRIVE
    EXTENT  OF S CONTRACTORS
    COMPOUND N WITHIN
    CARPARK  9B
    SEGMENTAL  PAVEMENT.  REFER  TO  LANDSCAPE  DOCUMENTATION
    SETOUT  POINT  1
    64.4068
    NORTH
    QIBLA
    CONTRACTORS  FENCE  LINE
    CAMERA  POLE.  REFER O TO
    ELECTRICAL,  STRUCTURAL + +
    SECURITY  DOCUMENTATION
    SEGMENTAL D PAVED
    PATHWAY. R REFER
    TO E LANDSCAPE
    DOCUMENTATION. .
    ORIENTATION E RELATIVE
    TO  NORTH
    MARQUEE R POWER
    SUPPLY.  REFER O TO
    L ELECTRICAL
    DOCUMENTATION
    SETOUT  POINT  2
    DOB
    LINE  OF  SUSPENDED N CURTAIN
    OVER  SHOWN  DASHED
    FR
    FR
    S S
    NB
    NB
    RECESSED R ROLLER
    SHUTTER
    LINE  OF  ROOF  OVER
    SHOWN  DASHED
    FFL  9.475
    BOOK  SHELVING  UNIT  TYPE  A
    REFER  TO  DETAIL  110 N ON
    DRAWING  FD0121
    CORIAN T SEAT
    ESSB MSSB
    1 1 2 2 3 3
    FIBRE , COMMS.,
    SECURITY S SERVICES
    +  AV  RACK. R REFER
    TO L ELECTRICAL
    DOCUMENTATION
    AUDIO  CONTROL T CABINET
    REFER  TO L ELECTRICAL
    DOCUMENTATION
    FEMALE  ABLUTIONS
    106
    TILES
    MALE  PRAYER  SPACE
    101
    CARPET
    STORE  1.
    104
    VINYL
    MALE  KITCH.
    103
    TILES
    MIHRAB
    101
    CARPET
    MALE  ABLUTIONS
    107
    TILES
    . COMMS.
    ROOM
    D101
    ANTISTATIC  VINYL
    STORE  2.
    102
    VINYL
    ACCESS  TOILET
    110
    TILES
    FEMALE  KITCH.
    105
    TILES
    FEMALE  PRAYER  SPACE
    101
    CARPET
    FEMALE  ENTRY
    C102
    CARPET  TYPE  2
    E FEMALE
    VERANDA
    WW102
    SEALED  CONCRETE
    A
    SE0107
    B
    SE0107
    A
    SE0107
    C
    SE0108
    C
    SE0108
    D
    SE0108
    B
    SE0107
    D
    SE0108
    GENERAL  LEGEND
    TOILET  ROLL  HOLDER TRH
    HB HAND  BASIN
    SD SOAP  DISPENSER
    ATRH ACCESS  TOILET  ROLL  HOLDER
    PB PAPER  TOWEL  DISPENSER H WITH INTEGRATED N BIN
    AT ACCESS  TOILET
    ST SQUAT  TOILET
    FM FLOOR  MAT
    DOB DONATION  BOX.  REFER  TO  DETAIL  117  ON  DRAWING  FD0121
    LEGEND
    CORRIDOR  2
    C102
    FLOOR  MAT
    40
    CD0117
    41
    CD0117
    28
    CD0116
    08
    CD0110
    03
    CD0110
    29
    CD0116
    109
    FD0120
    38
    CD0111
    CORIAN T SEAT
    DOB
    FB FLOOR  BOX.  REFER  TO  ELECTRICAL  DOCUMENTATION
    T T TOILET
    WASH  TROUGH WT
    FFL  9.475
    CLNR
    111
    VINYL
    NOTES
    1.
    UNLESS  OTHERWISE  NOTED  ALL  STUDWORK S IS
    DIMENSIONED  TO  FACE  OF  STUD
    50  DIAMETER  SIPHONIC  RWDP  AND 0 50
    DIAMETER  SIPHONIC  OVERFLOW K PIPEWORK
    DROPPERS  IN  STUD  WALL
    E FEMALE
    COURTYARD
    SEALED  CONCRETE
    FFL  9.445
    E MALE
    VERANDA
    WW101
    SEALED  CONCRETE
    FFL  9.475
    E MALE
    COURTYARD
    SEALED  CONCRETE
    FFL  9.445
    37
    CD0111
    4 4 5 5 6 6 7 7 8 8 9 9
    UP
    LINE  OF  GLAZING W BELOW
    SHOWN  DASHED
    LINE  OF  GLAZING W BELOW
    SHOWN  DASHED
    UP
    UP
    E101
    S SERVICES
    CUPBOARD
    REFER O TO
    DETAIL 8 128
    ON G DRAWING
    FD0123
    FEMALE  SCREEN.  REFER  TO  DETAIL 0 120
    ON  DRAWING  FD0122
    MALE  SCREEN.  REFER O TO
    DETAIL  119  ON G DRAWING
    FD0122
    CUPBD CUPBOARD
    CUPBD
    ROOF  ACCESS  LADDER
    D1
    01
    D2
    02
    D4
    03
    D5
    04
    D4
    05
    D3
    06
    D1
    07
    08
    D7
    D8
    09
    D6
    10
    D6
    11
    D7
    12
    W1
    01
    W3
    02
    W3
    03
    W2
    04
    FFL  9.475
    ` `
    RECESSED R ROLLER
    SHUTTER
    D9
    13
    S S
    S S
    75  DIAMETER  SIPHONIC  RWDP  AND 5 75
    DIAMETER  SIPHONIC  OVERFLOW K PIPEWORK
    DROPPERS  IN  STUD  WALL
    75  DIAMETER  SIPHONIC  RWDP  AND 5 75
    DIAMETER  SIPHONIC  OVERFLOW K PIPEWORK
    DROPPERS  IN  STUD  WALL
    50  DIAMETER  SIPHONIC  RWDP  AND 0 50
    DIAMETER  SIPHONIC  OVERFLOW K PIPEWORK
    DROPPERS  IN  STUD  WALL
    JOINT  IN  CORIAN
    SEAT
    JOINT  IN  CORIAN  SEAT
    TENSIONED  FABRIC  SCREEN N ON
    FABRICATED  H.D.  GALV L STEEL
    FRAMING
    CARPET
    TYPE  1
    CARPET
    TYPE  2
    CARPET
    TYPE  1
    CARPET
    TYPE  2
    CARPET
    TYPE  1
    CARPET
    TYPE  2
    CARPET
    TYPE  1
    CARPET
    TYPE  2
    CARPET
    TYPE  1
    BOOK  SHELVING  UNIT  TYPE  B
    REFER  TO  DETAIL  112 N ON
    DRAWING  FD0121
    BOOK  SHELVING  UNIT  TYPE  B
    REFER  TO  DETAIL  112 N ON
    DRAWING  FD0121
    SHOE  STORE T UNIT
    REFER  TO L DETAIL
    118  ON G DRAWING
    FD0121
    CARPET
    TYPE  2
    FOR  CONTINUATION  OF  COURTYARD  LAYOUT  REFER  TO  DRAWING  CP0104
    2.
    REFER  TO  DRAWINGS  RE0118  +  RE0119  FOR M ROOM
    LAYOUTS
    10
    CD0111
    E
    SE0107
    E
    SE0107
    FB FB
    FB FB
    CD0113
    16
    CORIAN T SEAT
    LINE  OF  ROOF R OVER
    SHOWN  DASHED
    TENSIONED  FABRIC  SCREEN N ON
    FABRICATED  H.D.  GALV L STEEL
    FRAMING
    LINE  OF  ROOF R OVER
    SHOWN  DASHED
    CORIAN T SEAT
    LINE  OF  ROOF  OVER
    SHOWN  DASHED
    SHOE  STORE  UNIT R REFER
    TO  DETAIL  118 N ON
    DRAWING  FD0121
    TIMBER  STUD  FRAMED  WALL  WITH  INSULATION  AS . SPECIFIED.
    TYPICALLY  ALL  INTERNAL  WALLS  ARE  LINED H WITH
    PLASTERBOARD  AS  SPECIFIED  TO  BOTH  SIDES  EXCEPT E MALE
    +  FEMALE  ABLUTIONS,  ACCESS  TOILET  +  CLEANER H WHICH
    ARE  TO  BE  LINED H WITH FIBRE  CEMENT  SHEETS S AS
    SPECIFIED.  ALL  EXTERNAL  WALLS  TO  BE  LINED L INTERNAL
    WITH  PLASTERBOARD.  REFER  TO M ROOM ELEVATIONS + +
    SECTIONS  FOR  FINISHES.  REFER  TO  EXTERNAL S ELEVATIONS
    FOR  FINISH  TO  EXTERNAL  WALLS.
    PLYWOOD  LINED  TIMBER  TRUSS  WITH  INSULATION S AS
    SPECIFIED.  REFER  TO  STRUCTURAL S ENGINEERS
    DOCUMENTATION.  INSIDE  FACE  OF  PLYWOOD  TRUSS N WITHIN
    MALE  ENTRY,  MALE  PRAYER  SPACE,  FEMALE , ENTRY, E FEMALE
    PRAYER  SPACE  TO  BE  LINED  WITH  PLASTERBOARD S AS
    SPECIFIED.  REFER  TO  EXTERNAL  ELEVATIONS  FOR  FINISH O TO
    EXTERNAL  FACE.
    OUTSIDE  FACE F OF
    PLYWOOD  TRUSS S IS
    SETOUT  LINE
    OUTSIDE  FACE F OF
    PLYWOOD  TRUSS S IS
    SETOUT  LINE
    F101
    E FIRE
    R EXTINGUISHER
    LOCATED N IN
    CUPBOARD
    SERVICES  CUPBOARD.  REFER  TO L DETAIL
    132  ON  DRAWING  FD0123
    F102
    FIRE  EXTINGUISHER D LOCATED
    IN  CUPBOARD
    39
    CD0113
    CURTAIN  2
    CURTAIN  1
    LINE  OF G CLADDING
    BELOW  TRUSS N SHOWN
    D DASHED
    LINE  OF G CLADDING
    BELOW  TRUSS N SHOWN
    D DASHED
    32
    CD0117
    114
    FD0121
    ACCESS  PANEL  AT  HIGH  LEVEL
    MALE  ENTRY
    C101
    CARPET  TYPE  1
    CORRIDOR  1
    C101
    FLOOR  MAT
    CORIAN N SCREEN
    PANEL
    CD0111
    36
    125
    FD0122
    125
    FD0122
    1045 2840
    120
    3630 120 2220 120
    6000
    3745
    120
    2925 0 1020  180 2170 900 1475 950 520
    4500
    120 2055
    D7 G OPENING D4  OPENING
    100 1120 835
    120
    D6  OPENING
    680
    4425
    300
    2925 120 4720 9750
    2 W2
    FEMALE N KITCHEN STORE FEMALE  ABLUTIONS
    FEMALE  ENTRY  +  CORRIDOR  2
    6135
    FEMALE  PRAYER  SPACE FEMALE  /  MALE  PRAYER  SPACE
    STORE
    70
    CLEANER
    120
    ACCESS  TOILET
    4125 120
    FEMALE  VERANDA
    1045 2840 120 2625
    6000
    650 600 2380
    120
    2925 0 1020  180 900 1860 465
    120 2055
    100 1120 835
    120
    4425
    300 1845
    150
    2040 1800 2925 120
    23175
    8250
    7635
    70
    120
    775 120
    4125 120
    MALE  VERANDA MALE  ENTRY  /  CORRIDOR  1
    3210
    1 W1
    COMMS.  ROOM
    1845
    150
    MALE  PRAYER  SPACE
    D4  OPENING D7 G OPENING
    MALE  ABLUTIONS
    1785
    3000
    D6  OPENING
    MALE N KITCHEN
    9 D9
    120
    2220 120
    STORE ACCESS  TOILET CLEANER
    365 5235 365
    150 395 120
    4935
    120
    600 900 1260
    120
    D5  OPENING
    R CLEANER
    MALE  VERANDA
    5235
    FEMALE  VERANDA
    4935
    150 395 120
    2760
    ACCESS T TOILET
    2760
    1850 1080 1570
    D1  OPENING D3  OPENING
    1850 1080 1570
    D1 G OPENING
    D2  OPENING
    3525 120 3370 120 2090
    MALE  ABLUTIONS FEMALE  ABLUTIONS
    120 3525
    1870
    645 1445
    W3
    120
    3815 120
    MALE  PRAYER  SPACE
    2625
    2640 1200 120 980
    MALE  ENTRY  /  CORRIDOR  1 FEMALE  ENTRY  /  CORRIDOR  2
    4500
    1870
    6000
    1200
    1200
    600 120
    200 155
    120
    SETOUT  POINT - -
    END  OF  PLYWOOD  TRUSS
    70
    70
    725 190
    SETOUT  POINT - -
    END  OF  PLYWOOD  TRUSS
    440 2200 8920 440 2200
    150
    170
    120 120 2280
    COMMS.  ROOM
    120 3880 120 2280
    STORE  2.
    120
    W3
    150
    170
    120
    4505
    FEMALE  PRAYER  SPACE
    MALE  PRAYER  SPACE
    120 4650
    550 850 3250
    D8
    1200 455 1870
    CORRIDOR  1 MALE  ENTRY
    515 465 3525
    2205 120 2325
    MALE  KITCH.
    FEMALE  KITCH.
    465
    1200 455 1870
    3525
    515 3990
    585 585
    2910 2790
    MIHRAB
    FEMALE  ENTRY CORRIDOR  2
    14200
    TRUSS
    TRUSS
    TRUSS
    TRUSS
    2690 620
    C
    L L
    C
    L L
    3560 405
    C
    L L
    C
    L L
    530
    C
    L L
    2120
    C
    L L
    109 9
    108
    600 600 100 100
    FE
    FE FIRE  EXTINGUISHER
    FE
    MIN.
    CLEAR
    1 1
    A
    2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 11 12
    B
    C
    D D
    E E
    F
    G G
    H
    A A
    B
    C
    D D
    E E
    F F
    G G
    H
    F F  L  O  O R R P  L  A N N
    1:50
    WESTERN  AUSTRALIA  6160
    ABN  52  009  237  601
    T:  9433 8 1388 F:  9433  1991
    This  drawing  is  copyright  and  shall  always  remain  the  property f of
    ARMSTRONG  PARKIN  PTY  LTD  and  must  not  be  used  in  any  manner t without
    the  prior  written  approval  of  that  company.  Verify  all  dimensions  on  site d and
    report  all  discrepancies  to  the  Architect.  Await  Architect's  instructions r prior
    to  the  commencement  of  construction  or  fabrication.
    mail@armstrongparkin.com.au
    MUSALLA
    FLOOR  PLAN
    0 0
    PROJ
    APP
    REVISION REV DATE N DRN  CHK
    SP AS  CONSTRUCTED 17.06.13 CC SP
    NORTH
    GPO BOX U1987 PERTH WA 6845
     
    COL

    代写 Building Measurement 

     
    9595  NOMINAL
    SLAB  EDGE
    R R  1510
    SLAB  EDGE
    R R  4000
    SLAB  EDGE
    R R  1450
    SLAB  EDGE
    2370
    2370
    SLAB  EDGE
    47°
    60°
    64°
    SLAB  EDGE
    SLAB  EDGE
    50 1375 1000 650 50 1375 1000 650
    COL
    COL
    LIGHT  POLE.  REFER O TO
    ELECTRICAL S ENGINEERS
    DOCUMENTATION
    CONCRETE  SLAB  EDGE.  RL  9.445
    TAP TAP TAP TAP TAP
    CONCRETE B SLAB
    EDGE.  RL  9.445
    CONCRETE  SLAB . EDGE.
    RL  9.445
    CJ
    3850
    4270
    3 3  NO.  TREE . GRATES.
    REFER  TO E LANDSCAPE
    DOCUMENTATION
    SCREEN  WALL.  PAINT D FINISHED
    F.C.  SHEET  CLADDING  TO H BOTH
    SIDES  OF  FABRICATED  H.D. V GALV
    G FRAMING BETWEEN  MALE  +
    FEMALE  COURTYARDS
    TAP TAP
    WASH  TROUGH WT
    FALL
    DRAIN  GRATE
    FALL
    FALL
    COURTYARD  DRAIN  RL  9.420
    REFER  TO  HYDRAULIC S ENGINEERS
    DOCUMENTATION
    COURTYARD  DRAIN  RL  9.420
    REFER  TO C HYDRAULIC
    ENGINEERS  DOCUMENTATION
    CD0117
    33
    CD0117
    34
    FD0120
    107
    -
    - -
    CD0117
    35
    CJ
    CJ
    SETOUT  POINT  3
    SETOUT  POINT  2
    CJ
    SCREEN  FENCE  PROFILED L METAL
    CLADDING  TO  BOTH  SIDES F OF
    H.G.  GALV  STEEL  COLUMNS.
    CD0117
    33
    R2
    L FFL 9.4 45
    L FFL 9.4 45
    R1
    COL
    COL
    FALL FALL
    FALL FALL
    FALL
    FALL
    FALL
    FALL
    R3
    EDGE  OF  WATER  WASHED
    CONCRETE
    REFER  TO  DRAWING  FP0103  FOR  CONTINUATION
    ALUMINIUM  CLADDING  TO H BOTH
    SIDES  OF  FABRICATED . H.D.
    GALV  STEEL  FENCE  PANELS
    ALUMINIUM  CLADDING  TO H BOTH
    SIDES  OF  FABRICATED . H.D.
    GALV  STEEL  FENCE  PANELS
    EDGE  OF  WATER  WASHED
    CONCRETE
    STONE  MULCH.  REFER O TO
    LANDSCAPE  DOCUMENTATION
    SETOUT  R2
    1540
    C C
    SETOUT  R1
    SETOUT  LINE  FOR  COURTYARD
    FROM  END  OF  PLYWOOD  TRUSS
    LINE  OF  SLAB  EDGE
    C
    1150
    TREE  GRATE
    SETOUT
    SCREEN  FENCE. D PROFILED
    METAL  CLADDING  TO H BOTH
    SIDES  OF  H.D. V GALV
    STEEL  COLUMNS
    2700
    1200
    C
    FACE  OF  MALE D COURTYARD
    SLAB  EDGE
    R3  SETOUT
    LINE  OF  SETOUT  POINT  3
    8525
    C
    155
    R1  SETOUT
    150
    5675
    LINE  OF  SETOUT  POINT  2
    1200
    R2  SETOUT
    C
    2705
    LINE  OF  FEMALE D COURTYARD
    SLAB  EDGE
    2515
    DRAIN  GRATE
    CJ CJ
    CJ CJ CJ
    CJ CJ CJ
    2 2  NO.  TREE . GRATES.
    REFER  TO E LANDSCAPE
    DOCUMENTATION
    CJ
    COL
    COL
    COL
    C
    3400
    TREE
    GRATE
    500
    C
    TREE
    GRATE
    C
    1150
    TREE  GRATE
    SETOUT
    C
    500 3400
    TREE  GRATE
    C
    TREE  GRATE
    3400
    C
    TREE  GRATE
    COL
    COL
    COL
    COL
    CONCRETE  UPSTAND
    350 1305
    DRAIN
    CJ
    B
    HK
    HOSE  COCK HK
    F F
    EL0106
    F F
    EL0106
    GRATED  FLOOR  DRAIN
    GRATED  FLOOR  DRAIN
    EQ EQ
    50 50
    SCREEN  WALL  ELEVATION  -  FEMALE D COURTYARD
    1:50
    2400  NOM 2400  NOM 2400  NOM 2400  NOM
    50x75  RHS
    TOP  OF  SLAB  9.445
    C C C C
    RL  11.410
    LINE  OF  75x75  SHS N COLUMN
    SHOWN  DASHED
    LINE  OF  50x75  RHS  TOP L RAIL
    SHOWN  DASHED
    LINE  OF  50x75  RHS M BOTTOM
    RAIL  SHOWN  DASHED
    75x75  SHS  COLUMNS 75x75  SHS N MIDSPAN
    BETWEEN  COLUMNS
    FC  SHEET  CLADDING H WITH
    EXPRESSED  JOINTS. T PAINT
    FINISHED
    LINE  OF D EXPRESSED
    JOINTS  IN  FC  SHEET
    50
    LINE  OF  FACE
    OF  BUILDING
    COL COL COL COL COL
    C
    FULL  HEIGHT T PAINT
    FINISHED V GALV
    PRESSING  TO  END F OF
    SCREEN  WALL  TO T FIT
    UNDER  FC  SHEET + +
    CAP  END  OF  COLUMN
    TWO  PART L METAL
    PRESSING  TO  END F OF
    SCREEN  WALL
    FEMALE  ENTRY  FENCE  PANELS
    1:50
    NOTE:  MALE  ENTRY  HANDED
    LINE  OF  75x75  SHS N COLUMN
    SHOWN  DASHED
    400 375
    LINE  OF  50x75  RHS  TOP L RAIL
    SHOWN  DASHED
    FFL  9.445
    C C C
    RL  11.410
    465 465
    C C C
    200
    C
    LINE  OF  50x75  RHS M BOTTOM
    RAIL  SHOWN  DASHED
    SECURITY  SLAVE  INTERCOM  + D CARD
    READER.  REFER  TO  SECURITY + +
    ELECTRICAL  DOCUMENTATION
    STONE  MULCH.  REFER O TO
    LANDSCAPE  DOCUMENTATION
    LINE  OF  EDGE  OF  WALL  + B SLAB
    BELOW  SHOWN  DASHED
    LINE  OF  EDGE  OF  WALL  + B SLAB
    BELOW  SHOWN  DASHED
    SE0107
    COL COL
    G1
    14
    COL
    ALUMINIUM  CLADDING  TO H BOTH
    SIDES,  TOP  +  ENDS  OF E FENCE
    SIDE  PANELS  + . GATE.
    PROVIDE  CONDUITS N WITHIN
    STEEL  COLUMNS  FOR Y SECURITY
    +  ELECTRICAL  INSTALLATION O TO
    ELECTRIC  GATE , LOCK,
    INTERCOM  +  CARD  READER
    COL
    150
    C
    150
    C
    150
    C
    150
    150
    150
    C
    C C
    FFL  9.475
    FFL  9.475
    5210
     
    F F
    G G
    H
    GPO BOX U1987 PERTH WA 6845
    TEL 9266 9266 FAX 9266 2660
    University Properties
    University of Technology
    DRN  BY
    CLIENT  APP
    DESIGNED
    DATE
    CHECKED
    PROJ  APP
    This drawing is the property of Curtin University and furnished for the
    sole use of the recipient. Acceptance of the same constitutes an
    agreement that it will not be published, reproduced, transmitted or
    given to any other party without our permission. Infringement of the
    above may attract claims for compensation.
    CHECK  SITE  DIMENSIONS
    AND  VERIFY  DRAWINGS
    PRIOR  TO  CONSTRUCTION
    BENTLEY  CAMPUS
    UPJ0246
    01B510-A-CP0104
    04 25 0 0
    1:50
    AS  CONSTRUCTED
    A1
    DS
    31-05-2012
    SP
    SP
    SP
    CURTIN
    ISSUE
    CURTIN
    PROJ  No
    SCALE
    DWG  No
    G DWG
    STATUS
    SHEET OF
    SHEET
    SIZE
    WESTERN  AUSTRALIA  6160
    ABN  52  009  237  601
    T:  9433 8 1388 F:  9433  1991
    This  drawing  is  copyright  and  shall  always  remain  the  property f of
    ARMSTRONG  PARKIN  PTY  LTD  and  must  not  be  used  in  any  manner t without
    the  prior  written  approval  of  that  company.  Verify  all  dimensions  on  site d and
    report  all  discrepancies  to  the  Architect.  Await  Architect's  instructions r prior
    to  the  commencement  of  construction  or  fabrication.
    mail@armstrongparkin.com.au
    MUSALLA
    BLDG  510  LEVEL  01
    COURTYARD  PLAN
     
    PB
    D08
    09
    CEILING  SPACE CEILING  SPACE
    TRAFFICABLE . WALKWAY.
    REFER  TO  ROOF Y SAFETY
    DRAWINGS
    EC
    W01
    01
    PROFILED  METAL  WALL G CLADDING
    ON  SARKING  ON D INSULATED
    PLYWOOD  FACED  TRUSS.  REFER O TO
    STRUCTURAL  DOCUMENTATION
    SUSPENDED H FLUSH
    PLASTERBOARD  CEILING H WITH
    INSULATION  OVER.  PAINT  FINISH
    SUSPENDED H FLUSH
    PLASTERBOARD  CEILING H WITH
    INSULATION  OVER.  PAINT  FINISH
    PROFILED  METAL  ROOF G SHEETING
    ON  FOIL  FACED N INSULATION
    BLANKET  ON  STEEL  SAFETY  MESH
    PROFILED  METAL  ROOF G SHEETING
    ON  FOIL  FACED N INSULATION
    BLANKET  ON  STEEL  SAFETY  MESH
    FRAMED D PLASTERBOARD
    CEILING  WITH N INSULATION
    OVER.  PAINT  FINISH
    MALE  SCREEN  UNIT. R REFER
    TO  DETAIL  119  ON G DRAWING
    FD0122
    FEMALE  SCREEN  UNIT. R REFER
    TO  DETAIL  120  ON G DRAWING
    FD0122
    SEGMENTAL  PAVED . PATHWAY.
    REFER  TO E LANDSCAPE
    DOCUMENTATION
    STONE  MULCH . TREATMENT.
    REFER  TO E LANDSCAPE
    DOCUMENTATION
    CONCRETE  FLUSH . KERB.
    REFER  TO L STRUCTURAL
    ENGINEERS  DOCUMENTATION
    SEGMENTAL D PAVED
    PATHWAY.  REFER O TO
    E LANDSCAPE
    DOCUMENTATION
    STONE  MULCH  TREATMENT.  REFER
    TO  LANDSCAPE  DOCUMENTATION
    CONCRETE  FLUSH . KERB.
    REFER  TO L STRUCTURAL
    ENGINEERS  DOCUMENTATION
    PB
    CEILING  SPACE
    CEILING  SPACE CEILING  SPACE
    D6
    10
    D04
    03
    SUSPENDED H FLUSH
    PLASTERBOARD  CEILING H WITH
    INSULATION  OVER.  PAINT  FINISH
    SUSPENDED H FLUSH
    PLASTERBOARD  CEILING H WITH
    INSULATION  OVER.  PAINT  FINISH
    SUSPENDED D PLASTERBOARD
    CEILING  WITH  INSULATION . OVER.
    PAINT  FINISH
    D FRAMED
    D PLASTERBOARD
    CEILING H WITH
    INSULATION . OVER.
    PAINT  FINISH
    REFER  TO M ROOM
    S ELEVATIONS
    DRAWING  RE0119
    REFER  TO  ROOM S ELEVATIONS
    DRAWING  RE0118
    REFER  TO  ROOM S ELEVATIONS
    DRAWING  RE0118
    REFER  TO M ROOM
    S ELEVATIONS
    DRAWING  RE0119
    REFER O TO
    M ROOM
    S ELEVATIONS
    G DRAWING
    RE0119
    DIVIDING  FABRIC  CURTAIN  1 + +
    CURTAIN  RAIL  FIXED  TO  STEEL M BEAM
    OVER.  REFER  TO  DETAIL  23 N ON
    DRAWING  CD0114
    SUPPLY  AIR  GRILLE.  REFER O TO
    MECHANICAL  DOCUMENTATION
    PROFILED  METAL  ROOF G SHEETING
    ON  FOIL  FACED N INSULATION
    BLANKET  ON  STEEL  SAFETY  MESH
    RECESSED  LIGHT  FITTING N IN
    SUSPENDED  CEILING.  REFER O TO
    ELECTRICAL  DOCUMENTATION
    EC
    PROFILED  METAL  ROOF G SHEETING
    ON  FOIL  FACED N INSULATION
    BLANKET  ON  STEEL  SAFETY  MESH
    PROFILED  METAL  ROOF G SHEETING
    ON  FOIL  FACED N INSULATION
    BLANKET  ON  STEEL  SAFETY  MESH
    TRAFFICABLE . WALKWAY.
    REFER  TO  ROOF Y SAFETY
    DRAWINGS
    LINE  OF  EXISTING D GROUND
    LEVEL
    STONE  MULCH  GROUND . TREATMENT.
    REFER  TO  LANDSCAPE  DOCUMENTATION
    CONCRETE  FLUSH  KERB.  REFER O TO
    STRUCTURAL  ENGINEERS  DOCUMENTATION
    LINE  OF  EXISTING  GROUND L LEVEL
    SHOWN  DASHED
    CONCRETE  SLAB  ON  WPM. R REFER
    TO  STRUCTURAL S ENGINEERS
    DOCUMENTATION
    TENSIONED C FABRIC
    SUNSHADE  SCREEN. D HD
    GALV  FABRICATED L STEEL
    FRAMING.  REFER  TO L DETAIL
    10  ON  DRAWING  CD0111
    LINE  OF  LANDSCAPE . LEVELS.
    REFER  TO E LANDSCAPE
    DOCUMENTATION
    METAL  PRESSING  TYPE . Y.
    POWDERCOAT  FINISH
    SEGMENTAL D PAVED
    PATHWAY.  REFER O TO
    LANDSCAPE  DOCUMENTATION
    CD0113
    15
    LINE  OF  EXISTING D GROUND
    LEVEL  SHOWN  DASHED
    STONE  MULCH . TREATMENT.
    REFER  TO E LANDSCAPE
    DOCUMENTATION
    REINFORCED  CONCRETE  SLAB N ON
    WPM  ON  COMPACTED  FILL. R REFER
    TO  STRUCTURAL . DOCUMENTATION.
    REFER  TO  SPECIFICATION R FOR
    RETICULATED  TERMITE T TREATMENT
    SYSTEM
    LEGEND
    EC EVAPORATIVE  COOLING  UNIT  REFER O TO
    MECHANICAL  ENGINEERS N DOCUMENTATION
    FOR  DETAIL
    PB FLUSHED  PLASTERBOARD  AS . SPECIFIED.
    PAINT  FINISH
    REFER  TO  ELECTRICAL  +  MECHANICAL  DOCUMENTATION  FOR T EXTENT
    OF  ALL  PENETRATIONS  REQUIRED  IN  CEILINGS  AND  WALLS R FOR
    ELECTRICAL  +  MECHANICAL  SERVICES
    ALL  MECHANICAL  SERVICE  ITEMS  INCLUDING  DUCTWORK  ARE N SHOWN
    INDICATIVE  ONLY.  REFER  TO  MECHANICAL S ENGINEERS
    DOCUMENTATION  FOR  DETAIL
    1.  UNLESS  OTHERWISE  NOTED  ALL  WORK  SHOWN  ON  THIS  DRAWING S IS
    NEW  WORK
    2.  ENSURE  TO  CO-ORDINATE  INFORMATION  IN  THIS  DRAWING  WITH R OTHER
    ARCHITECTURAL  DOCUMENTATION  AS  WELL  AS  ALL D ASSOCIATED
    CONSULTANT  DOCUMENTATION  FOR  THIS  PROJECT
    . 3. UNLESS  NOTED  OTHERWISE  ALL  EXPOSED  STRUCTURAL L STEEL
    MEMBERS  INCLUDING  BEAMS,  TRUSSES,  BRACING,  COLUMNS  + S RHS
    PURLINS  TO  HAVE  PAINT  FINISH.
    4.  ALL  PLASTERBOARD  CEILINGS  TO  HAVE  PAINT  FINISH.. .
    CD0112
    12
    U/S  CEILING
    U/S  STEEL  BEAM
    RMDF
    MIHRAB
    101
    PROFILED  METAL L WALL
    CLADDING  ON  SARKING N ON
    PLYWOOD  ON D STUD
    FRAMING  WITH  INSULATION
    CURTAIN  RAIL  STEEL  BEAM
    PAINT  FINISHED  FIBRE T CEMENT
    SHEETING  ON  SARKING  ON D STUD
    FRAMING  WITH  INSULATION
    REFER  TO E LANDSCAPE
    DOCUMENTATION R FOR
    AMENDMENTS  TO D FINISHED
    GROUND  LINE
    RMDF
    D SUSPENDED
    CURTAIN L RAIL
    FIXED  TO T PAINT
    FINISHED L STEEL
    BEAM  OVER
    REINFORCED  CONCRETE  SLAB N ON
    WPM  ON  COMPACTED  FILL. R REFER
    TO  STRUCTURAL . DOCUMENTATION.
    REFER  TO  SPECIFICATION R FOR
    RETICULATED  TERMITE T TREATMENT
    SYSTEM
    FEMALE  PRAYER  SPACE
    101
    MALE  PRAYER  SPACE
    101
    RMDF RMDF
    CURTAIN  RAIL  FIXED  TO  WALL
    SUPPLY  AIR  GRILLE.  REFER O TO
    MECHANICAL  DOCUMENTATION
    CEILING  SPACE
    EXTENT  OF  CURTAIN  1  IN N OPEN
    POSITION
    PB
    PAINT  FINISHED D PLASTERBOARD
    LINING  TO  INSIDE
    PAINT  FINISHED  FIBRE T CEMENT
    SHEETING  ON  SARKING  ON D STUD
    FRAMING  WITH  INSULATION
    OFFSET  SEWER  PUMP N STATION
    VENT  PIPE  IN  CEILING E SPACE
    TO  LOCATION  OF F ROOF
    PENETRATION
    PROFILED  METAL F ROOF
    SHEETING  ON  FOIL D FACED
    INSULTATION  BLANKET N ON
    STEEL  SAFETY  MESH
    TOP  OF  PLYWOOD  TRUSS
    TOP  OF  WALL
    U/S  CEILING
    REINFORCED  CONCRETE  SLAB N ON
    WPM  ON  COMPACTED  FILL. R REFER
    TO  STRUCTURAL . DOCUMENTATION.
    REFER  TO  SPECIFICATION R FOR
    RETICULATED  TERMITE T TREATMENT
    M SYSTEM
    RMDF RMDF
    PB
    CEILING  SPACE
    LINE  OF  EXISTING D GROUND
    LEVEL  SHOWN  DASHED
    PROFILED  METAL  WALL G CLADDING
    ON  SARKING  ON D INSULATED
    PLYWOOD  FACED  TRUSS.  REFER O TO
    STRUCTURAL  DOCUMENTATION
    RMDF RECESSED  MDF  SKIRTING.  PAINT  FISH
    NOTE
    PAINT D FINISHED
    PLASTERBOARD G LINING
    TO  INSIDE  OF D PLYWOOD
    FACED  TRUSS
    PAINT  FINISHED D PLASTERBOARD
    LINING  TO  INSIDE  OF D PLYWOOD
    FACED  TRUSS
    PAINT D FINISHED
    PLASTERBOARD G LINING
    TO  INSIDE
    STEEL  BEAM R FOR
    CURTAIN  RAIL
    REMOVABLE  CORIAN  PANEL
    PROVIDE  CONCEALED  SPIGOT T AT
    END  OF  BEAM  FOR N CONNECTION
    INTO  WALL  FRAMING
    FRAMED D PLASTERBOARD
    CEILING H WITH
    INSULATION  OVER.
    METAL  PRESSING  TYPE . W.
    POWDERCOAT  FINISH
    METAL  PRESSING  TYPE . W.
    POWDERCOAT  FINISH
    METAL  PRESSING  TYPE . W.
    POWDERCOAT  FINISH
    METAL  PRESSING  TYPE . W.
    POWDERCOAT  FINISH
     
    H
    WESTERN  AUSTRALIA  6160
    ABN  52  009  237  601
    T:  9433 8 1388 F:  9433  1991
    This  drawing  is  copyright  and  shall  always  remain  the  property f of
    ARMSTRONG  PARKIN  PTY  LTD  and  must  not  be  used  in  any  manner t without
    the  prior  written  approval  of  that  company.  Verify  all  dimensions  on  site d and
    report  all  discrepancies  to  the  Architect.  Await  Architect's  instructions r prior
    to  the  commencement  of  construction  or  fabrication.
    mail@armstrongparkin.com.au
    MUSALLA
    SECTIONS_02
    0 0
    PROJ
    APP
    REVISION REV DATE N DRN  CHK
    SP AS  CONSTRUCTED 17.06.13 CC SP
    GPO  BOX  U1987  PERTH  WA  6845
    TEL  9266 6 9266 FAX  9266  2660
    University  Properties
    University of Technology
    DRN  BY
    CLIENT  APP
    DESIGNED
    DATE
    CHECKED
    PROJ  APP
    This This drawing drawing is is the the property property of of Curtin Curtin University University and and furnished furnished for for the the
    sole sole use use of of the the recipient. recipient. Acceptance Acceptance of of the the same same constitutes constitutes an an
    agreement agreement that that it it will will not not be be published, published, reproduced, reproduced, transmitted transmitted or or
    given given to to any any other other party party without without our our permission. permission. Infringement Infringement of of the the
    above above may may attract attract claims claims for for compensation. compensation.
    CHECK  SITE  DIMENSIONS
    AND  VERIFY  DRAWINGS
    PRIOR  TO  CONSTRUCTION
    BENTLEY  CAMPUS
    UPJ0246
    01B510-A-SE0108
    08 25 0 0
    1:50
    AS  CONSTRUCTED A1
    AW
    31-05-2012
    SP
    SP
    SP
    CURTIN
    ISSUE
    CURTIN
    PROJ  No
    SCALE
    DWG  No
    G DWG
    STATUS
    SHEET OF
    SHEET
    SIZE
    BLDG  510  LEVEL  01
    LEGEND
    EC EVAPORATIVE  COOLING  UNIT  REFER O TO
    MECHANICAL  ENGINEERS N DOCUMENTATION
    FOR  DETAIL
    PB FLUSHED  PLASTERBOARD  AS . SPECIFIED.
    PAINT  FINISH
    REFER  TO  ELECTRICAL  +  MECHANICAL  DOCUMENTATION  FOR T EXTENT
    OF  ALL  PENETRATIONS  REQUIRED  IN  CEILINGS  AND  WALLS R FOR
    ELECTRICAL  +  MECHANICAL  SERVICES
    ALL  MECHANICAL  SERVICE  ITEMS  INCLUDING  DUCTWORK  ARE N SHOWN
    INDICATIVE  ONLY.  REFER  TO  MECHANICAL S ENGINEERS
    DOCUMENTATION  FOR  DETAIL
    1.  UNLESS  OTHERWISE  NOTED  ALL  WORK  SHOWN  ON  THIS  DRAWING S IS
    NEW  WORK
    2.  ENSURE  TO  CO-ORDINATE  INFORMATION  IN  THIS  DRAWING  WITH R OTHER
    ARCHITECTURAL  DOCUMENTATION  AS  WELL  AS  ALL D ASSOCIATED
    CONSULTANT  DOCUMENTATION  FOR  THIS  PROJECT
    . 3. UNLESS  NOTED  OTHERWISE  ALL  EXPOSED  STRUCTURAL L STEEL
    MEMBERS  INCLUDING  BEAMS,  TRUSSES,  BRACING,  COLUMNS  + S RHS
    PURLINS  TO  HAVE  PAINT  FINISH.
    4.  ALL  PLASTERBOARD  CEILINGS  TO  HAVE  PAINT  FINISH.. .
    RMDF RECESSED  MDF  SKIRTING.  PAINT  FISH
    NOTE
    CONCRETE  FLUSH . KERB.
    REFER  TO L STRUCTURAL
    ENGINEERS  DOCUMENTATION
    3600MM L AFFL U/S  CEILING
    FFL  9.475
    RL  9.835
    3600MM L AFFL U/S  CEILING
    FFL  9.475
    RL  9.835
    FEMALE  ENTRY
    C102
    S S  E  C  T  I  O N N C  - C C
    1:50
    S S  E  C  T  I  O N N D  - D D
    1:50
    MALE  PRAYER
    SPACE
    101
    MIHRAB
    101
    CD0113
    17
    MALE  PRAYER
    SPACE
    101
    PROFILED  METAL  WALL G CLADDING
    ON  SARKING  ON D INSULATED
    PLYWOOD  FACED  TRUSS.  REFER O TO
    STRUCTURAL  DOCUMENTATION
    SUSPENDED  FLUSH D PLASTERBOARD
    CEILING  WITH  INSULATION  OVER. T PAINT
    FINISH
    PROFILED  METAL  ROOF G SHEETING
    ON  FOIL  FACED N INSULATION
    BLANKET  ON  STEEL  SAFETY  MESH
    LINE  OF  EXISTING  GROUND  LEVEL
    SHOWN  DASHED
    SEGMENTAL  PAVED . PATHWAY.
    REFER  TO E LANDSCAPE
    DOCUMENTATION
    STONE  MULCH D GROUND
    TREATMENT.  REFER  TO E LANDSCAPE
    DOCUMENTATION
    CONCRETE  FLUSH . KERB.
    REFER  TO L STRUCTURAL
    ENGINEERS  DOCUMENTATION
    PROFILED  METAL  ROOF G SHEETING
    ON  FOIL  FACED N INSULATION
    BLANKET  ON  STEEL  SAFETY  MESH
    PB PB PB
    PROFILED  METAL  WALL G CLADDING
    ON  SARKING  ON D INSULATED
    PLYWOOD  FACED  TRUSS.  REFER O TO
    STRUCTURAL  DOCUMENTATION
    CEILING  SPACE
    W02
    04
    W01
    01
    BOOK  SHELVING  UNIT  TYPE . B.
    REFER  TO  DETAIL  112 N ON
    DRAWING  FD0121
    SAND  PAD
    W03
    03
    W03
    02
    SEGMENTAL  PAVED . PATHWAY.
    REFER  TO E LANDSCAPE
    DOCUMENTATION
    STONE  MULCH D GROUND
    TREATMENT.  REFER O TO
    LANDSCAPE  DOCUMENTATION
    REFER  TO E LANDSCAPE
    DOCUMENTATION  FOR S AMENDMENTS
    TO  FINISHED  GROUND  LINE
    TENSIONED  FABRIC E SUNSHADE
    SCREEN.  HD  GALV D FABRICATED
    STEEL  FRAMING.  REFER O TO
    DETAIL  10  ON  DRAWING  CD0111
    SUSPENDED  FC  SHEET D LINED
    SOFFIT  WITH N INSULATION
    OVER.  PAINT  FINISH
    FC  SHEET  LINING  ON G SARKING
    ON  STUD  FRAMING.  PAINT  FINISH
    W03
    03
    STONE  MULCH D GROUND
    TREATMENT.  REFER O TO
    LANDSCAPE  DOCUMENTATION
    CONCRETE  FLUSH . KERB.
    REFER  TO L STRUCTURAL
    ENGINEERS  DOCUMENTATION
    REFER  TO E LANDSCAPE
    DOCUMENTATION R FOR
    AMENDMENTS  TO D FINISHED
    GROUND  LINE
    PB PB
    CEILING  SPACE
    CEILING  SPACE
    SUSPENDED  RAKING D PLASTERBOARD
    CEILING  WITH  INSULATION . OVER.
    PAINT  FINISH
    W01
    01
    EXTENT OF LOW LEVEL WINDOW
    SHOE  STORAGE.  REFER  TO  DETAIL  118 N ON
    DRAWING  FD0121
    FC  SHEET  LINING  ON  SARKING  ON D STUD
    FRAMING.  PAINT  FINISH.
    SUSPENDED  FC  SHEET  LINED  SOFFIT H WITH
    INSULATION  OVER.  PAINT  FINISH
    METAL  PRESSING  TYPE  M. T POWDERCOAT
    FINISH
    PROFILED  METAL  ROOF  SHEETING  ON L FOIL
    FACED  INSULATION  BLANKET  ON L STEEL
    SAFETY  MESH
    RECESSED  LIGHT  FITTING.  REFER O TO
    ELECTRICAL  DOCUMENTATION
    RECESSED  LIGHT . FITTING.
    FRAME  RECESSED D AROUND
    FITTING.  REFER O TO
    ELECTRICAL  DOCUMENTATION
    LEGEND
    CD0110
    05
    CD0110
    04
    CD0113
    18
    MALE  PRAYER  SPACE
    101
    FEMALE  PRAYER  SPACE
    101
    DIVIDING C FABRIC
    CURTAIN.  REFER O TO
    SPECIFICATION
    RMDF
    RL 5 13.835 TOP  OF  FASCIA  FRAMING
    FC
    RMDF
    CORIAN  SEAT CORIAN  SEAT
    RMDF
    REINFORCED  CONCRETE  SLAB N ON
    WPM  ON  COMPACTED  FILL. R REFER
    TO  STRUCTURAL . DOCUMENTATION.
    REFER  TO  SPECIFICATION R FOR
    RETICULATED  TERMITE T TREATMENT
    SYSTEM
    PB
    STEEL  BEAM G SUPPORTING
    SUSPENDED  CURTAIN . RAIL.
    PROVIDE  CONCEALED T SPIGOT
    AT  END  OF  BEAM R FOR
    N CONNECTION INTO L WALL
    FRAMING
    CD0113
    19
    PROFILED  METAL F ROOF
    SHEETING  ON  FOIL D FACED
    INSULATION  BLANKET N ON
    STEEL  SAFETY  MESH
    PROFILED  METAL  ROOF  SHEETING N ON
    FOIL  FACED  INSULATION  BLANKET N ON
    STEEL  SAFETY  MESH
    PB
    RL 5 13.835 TOP  OF  PLYWOOD  TRUSS
    CD0113
    19
    REINFORCED  CONCRETE  SLAB  ON  WPM N ON
    COMPACTED  FILL.  REFER  TO L STRUCTURAL
    DOCUMENTATION.  REFER  TO N SPECIFICATION
    FOR  RETICULATED  TERMITE T TREATMENT
    SYSTEM
    RMDF RMDF
    STEEL  BEAM G SUPPORTING
    SUSPENDED  CURTAIN  RAIL
    PAINT  FINISHED D PLASTERBOARD
    LINING  TO  INSIDE
    PAINT  FINISHED D PLASTERBOARD
    LINING  TO  INSIDE
    FC FC
    FC
    PB PB
    SUSPENDED D PLASTERBOARD
    CEILING  WITH N INSULATION
    OVER.  PAINT  FINISH
    REMOVABLE  500  WIDE  24 K THICK
    CORIAN  PANEL  HOUSED  INTO m 5mm
    DEEP  REBATE  IN  CORIAN  SEAT + +
    REBATED  PAINT  FINISHED  MDF L PANEL
    IN  WALL.  PROVIE  CORIAN  DOWELS N IN
    END  OF  CORIAN  PANEL  THAT N CAN
    BE  INSERTED  INTO  HOLES D DRILLED
    IN  MDF  WALL  PANEL
    METAL  PRESSING  TYPE . W.
    POWDERCOAT  FINISH
    METAL  PRESSING  TYPE . W.
    POWDERCOAT  FINISH
    METAL  PRESSING  TYPE . X.
    POWDERCOAT  FINISH
    9.850 S U/S
    CD0113
    20
    CD0113
    21
    CEILING  SPACE
    RECESSED  FLOOR  DRAIN H FLUSH
    WITH  TOP  OF  FINISHED E CONCRETE
    SLAB.  REFER  TO C HYDRAULIC
    DOCUMENTATION
    CONCRETE  SLABS  ON . WPM.
    REFER  TO L STRUCTURAL
    ENGINEERS  DOCUMENTATION.
    CD0110
    06
    RMDF
    PB
    FC
    FC
    FC
    FC
    LINE  OF  EXISTING D GROUND
    LEVEL  SHOWN  DASHED
    CD0110
    07
    WATER  WASHED  CONCRETE S SLABS
    ON  WPM.  REFER  TO L STRUCTURAL
    ENGINEERS  DOCUMENTATION.
    FEMALE  VERANDA
    WW102
    Project Option 2 – BER School Building
    0 25
    Government of
    Treasury and Finance
    Western Australia
    Maunsell Australia Pty Ltd
    3 Forrest Place
    GPO Box B59, Perth 6849
    Western Australia
    Tel +61 8 6430 2000
    Fax +61 8 6430 2999
    perth@maunsell.com
    ABN 20 093 846 925
    THREE CLASSROOM AND MUSIC BLOCK

    代写 Building Measurement